PLANNING / SELECTION / HANDOVER
Before choosing the equipment
Record building loads, occupancy and ventilation needs before selecting capacity. Ask about structural suitability, curb adaptation, lifting access and weatherproofing responsibilities.
What belongs in the quote
Separate crane work, roof work, electrical or fuel connections and controls in the quote. Request startup, balancing and ventilation verification records.
Think about the surrounding system
Bring operating hours, occupancy patterns, tenant constraints and existing equipment schedules to the first discussion. Agree who owns design, electrical work, structural review, roof penetrations, controls and commissioning. Plan shutdowns around the building rather than discovering access restrictions when replacement equipment arrives.
Three questions for your contractor
- Can the roof and curb support the proposal?
- Who handles lifting and weatherproofing?
- How are ventilation requirements addressed?
Prepare a useful first conversation
Bring the site location, building use, equipment model details and photographs of accessible equipment. Describe the problem or planned change and any access or shutdown constraints. Ask the contractor to identify design assumptions, excluded work, required approvals and who will commission the finished system.
This is a project-planning guide. Final equipment selection and installation details need a qualified contractor or designer familiar with the site.